深圳元遠(yuǎn)建筑科技發(fā)展有限公司,深圳市建筑設(shè)計(jì)研究總院有限公司
客戶:深圳市龍華區(qū)第三小學(xué)
主創(chuàng)建筑師:朱競翔,廉大鵬,何英杰,劉鑫程
項(xiàng)目團(tuán)隊(duì):歐陽浩,朱俊,劉清峰
設(shè)計(jì)團(tuán)隊(duì):韓國日,蔡春明,王衛(wèi)國
合作:深圳大學(xué)結(jié)構(gòu)工程研究所
結(jié)構(gòu)設(shè)計(jì):朱競翔,張建軍
結(jié)構(gòu)工程師:侯學(xué)凡,許歡
施工圖設(shè)計(jì):廉大鵬,吳長華,王鵬林,李羅兵,黃躍,李揚(yáng),呂均鵬,孫楊
顧問:羅見聞,陳賢川
總承建:深圳市建筑設(shè)計(jì)研究總院有限公司,深圳市市政工程總公司(EPC)
結(jié)構(gòu)和施工工藝咨詢:河南嘉合集成模塊房屋有限公司
結(jié)構(gòu)體系:輕型預(yù)制鋼框架+剪力桁架結(jié)構(gòu)
材料:鋼,結(jié)構(gòu)保溫板,鋼化玻璃
Client:Longhua No.3 Primary School,Shenzhen
Principal Architects:ZHU Jingxiang,LIAN Dapeng,HE Yingjie,LIU Xincheng
Project Team:OUYANG Hao,ZHU Jun,LIU Qingfeng
Design Team:HAN Guori,CAI Chunming,WANG Weiguo
Collaborator:Structure Engineering Institute of Shengzhen University
Structural Design:ZHU Jingxiang,ZHANG Jianjun
Structural Engineers:HOU Xuefan,XU Huan
Architects of Record:LIAN Dapeng,WU Changhua,WANG Pengling,LI Luobing,HUANG Yue,LI Yang,LU Junpeng,SUN Yang
Consultants:LUO Jianwen,CHEN Xianchuan
深圳市龍華第三小學(xué)坐落于龍華街道老城區(qū)中,建筑體量布局的扭轉(zhuǎn)與退讓,與場地上保留的喬木有機(jī)整合,塑造多個(gè)性格不同的院落景觀。學(xué)校空間獨(dú)創(chuàng)性地設(shè)計(jì)了雙廊道與環(huán)狀組合布局,既尊重小學(xué)生好動(dòng)的特性,也遮蔽直射陽光與幅射熱能。創(chuàng)新的結(jié)構(gòu)使用非常規(guī)的小斷面型鋼,以密度換強(qiáng)度,受力分離的構(gòu)件以分別抵抗垂直力和側(cè)向力,具有優(yōu)異的抗震、抗風(fēng)性能。輕量建筑改變的不只是建筑結(jié)構(gòu),它更大的是改變了人們的思維。運(yùn)用土地運(yùn)籌學(xué)原理,以更多維的方式來使用土地,從而為發(fā)展?fàn)幦r(shí)間。
1 外景 Exterior view
2 模型鳥瞰 Aerial view of the model
3 首層總平面 Ground floor plan
Longhua No.3 Primary School transformed a vacant site into a calm oasis in an old community.The buildings accommodate various plants and trees on the site to create a distinctive courtyard experience.Buildings incorporate a unique double-corridor and beltway layout that respects the students' natural tendency for running around.It also shelters them from the harsh sunlight of Shenzhen while creating a pleasantly lit environment.The innovative structures of the two schools use small-profile steel that strengthens the structure with higher density.The separated components resist vertical and lateral forces respectively,with excellent seismic and wind resistance.The principle of lightness and heaviness in architecture is not merely a question of structure.By adjusting the principles in line with the realities of the site,approaching the site from a variety of perspectives,faster and better development can be achieved.
場地面積:5800m2
基底面積:2700m2
總建筑面積:5480m2
建筑長度:91.6m
建筑高度:10.6m
設(shè)計(jì)時(shí)間:2019.05-2019.06
施工時(shí)間:2019.06-2019.10
竣工時(shí)間:2019.10
繪圖:元遠(yuǎn)建筑
攝影:張超
General Contractor:Shenzhen General Institute of Architectural Design and
Research Co.,Ltd.;Shenzhen Municipal Engineering Corp.(EPC)
Structural and Construction Consultant:Henan Jiahe Modular House Co.,Ltd.
Structural System:Lightweight prefabricated steel frame structure
Material:Profiled steel,SIP,tempered glass
Site Area:5800 m2
Built Area:2700 m2
Total Floor Area:5480 m2
Length:91.6 m
Height:10.6 m
Design Period:2019.05-2019.06
Construction Period:2019.06-2019.10
Completion Time:2019.10
Drawings:Unitinno
Photos:ZHANG Chao
4 內(nèi)景 Interior view
5.6 鳥瞰 Aerial views
7 外景 Exterior view
8 剖面大樣 Detail of section