設(shè)計(jì)單位:ALA建筑師事務(wù)所
項(xiàng)目概要:上世紀(jì)60年代劇院改造翻新8 025平方米,
擴(kuò)建部分包括一個(gè)新攝影棚3 470平方米
建筑面積:11 500平方米
竣工年份:2014年
項(xiàng)目攝影:Tuomas Uusheimo
設(shè)計(jì)團(tuán)隊(duì):Juho Gr?nholm, Antti Nousjoki, Janne Ter?svirta, Samuli Woolston, Heikki Riitahuhta, Toni Laurila, Pekka Sivula, Jyri Tartia, Auvo Lindroos, Harri Ahokas, Petra Grisova, Vladimir Ilic, Lotta Kindberg, Santtu Hyv?rinen and Gerard Gutierrez
結(jié)構(gòu)工程:Insin??ritoimisto Tanskanen
電氣工程:Insin??ritoimisto Tauno Nissinen
劇院工藝:Blue Node
項(xiàng)目施工:NCC建筑施工公司
Architects: ALA Architects
Program: Renovation of the 1960s theater 8 025m2, expansion including a new studio stage 3 470m2
Area: 11 500 m?
Year: 2014
Photographs: Tuomas Uusheimo
Team: ALA partners Juho Gr?nholm, Antti Nousjoki, Janne Ter?svirta and Samuli Woolston with Heikki Riitahuhta, Toni Laurila, Pekka Sivula, Jyri Tartia, Auvo Lindroos, Harri Ahokas,
Petra Grisova, Vladimir Ilic, Lotta Kindberg, Santtu Hyv?rinen and Gerard Gutierrez
Structural engineering: Insin??ritoimisto Tanskanen
HVAC: Granlund Kuopio
Electrical engineering: Insin??ritoimisto Tauno Nissinen
Geo planning: City of Kuopio Survey Division
Theater technics: Blue Node
Construction: NCC Construction
現(xiàn)在的庫(kù)奧皮奧城市劇院是建筑師赫爾默·斯丹露絲和Risto-Veikko Luukkonen在20世紀(jì)60年代的現(xiàn)代主義建筑。擴(kuò)建包括一個(gè)新的200座演播舞臺(tái),具有靈活的座位和舞臺(tái)機(jī)械。新的空間還提供裝載和物流、服裝生產(chǎn)和存儲(chǔ),以及新舞臺(tái)的支持功能。
從市中心接近劇院時(shí),唯一可見的變化是4米高的劇院塔樓。主舞臺(tái)的舞臺(tái)技術(shù)將全面更新,因此必須增加當(dāng)前塔樓的高度。附加組件可形成一個(gè)發(fā)光的玻璃燈箱,使舊塔的獨(dú)特形狀易于辨認(rèn)。
實(shí)際的擴(kuò)建部分是一個(gè)與現(xiàn)有體量垂直的簡(jiǎn)單矩形體。新舞臺(tái)與主舞臺(tái)連接,像一個(gè)水平版本的舞臺(tái)塔。這是一個(gè)堅(jiān)固的永久性現(xiàn)代擴(kuò)建部分,以同等質(zhì)量和耐久性對(duì)舊結(jié)構(gòu)進(jìn)行補(bǔ)充。
公共門廳在新舊體量之間延伸,形成像橋一樣的傾斜空間,懸置在新舊體量中間的新室外觀眾席上方。
這座古老的建筑擁有美麗、永恒的材料配色,由白色混凝土板、玻璃和赤陶瓷磚組成。擴(kuò)建部分覆蓋著多變、折面的白色混凝土板,這表明新大廳內(nèi)部也有類似的聲學(xué)優(yōu)化包層。
The existing Kuopio City Theatre is a 1960s modernist building by architects Helmer Stenros and Risto-Veikko Luukkonen. The expansion includes a new 200-seat studio stage with flexible seating and stage mechanics. New spaces are also provided for loading and logistics, costume manufacturing and storage, and support functions of the new stage.
The only visible alteration when approaching the theatre from the city centre is the four meter elevation of the theatre tower. The stage technology for the main stage will be completely updated, and the current tower has to be raised. The add-on will form a glowing glass lantern, leaving the distinctive shape of the old tower recognizable.
The actual expansion is a simple rectangular volume located perpendicularly to the existing volume. The new stage connects to the main stage like a horizontal version of the stage tower. It is a solid and permanent, contemporary addition which continues and complements the old structure with equal quality and permanence.
The public foyer is extended between the new and old volume as a bridge-like angled space, which floats above the new outdoor auditorium which is created between the old and new volume.
The old building has a beautiful and timeless material palette consisting of white concrete panels, glass and terracotta tiles. The extension is clad in white concrete panels with a wrinkled, varying surface form, which indicates a similar acoustically optimized cladding inside the new hall.