設(shè)計(jì)單位:ALA建筑師事務(wù)所
主創(chuàng)設(shè)計(jì):Juho Gr?nholm, Antti Nousjoki,
Samuli Woolston
設(shè)計(jì)團(tuán)隊(duì):uho Gr?nholm, Antti Nousjoki, Samuli Woolston, Pekka Tainio, Tuulikki Tanska, Rachel Murray, Anssi Luodem?ki, Harri Humppi
建筑面積:19 700平方米
竣工年份:2020年
項(xiàng)目攝影:Tuomas Uusheimo, Marc Goodwin | Archmospheres
結(jié)構(gòu)工程:芬蘭AFRY公司
項(xiàng)目管理:芬蘭Jones Lang LaSalle
總承包商:SRV建筑施工公司
交通設(shè)計(jì):芬蘭WSP公司
景觀設(shè)計(jì):Roslings Manor園林公司
地質(zhì)工程:Sipti Infra Oy
Architects: ALA Architects
Lead Architects: Juho Gr?nholm, Antti Nousjoki, Samuli Woolston
Design Team: Juho Gr?nholm, Antti Nousjoki, Samuli Woolston, Pekka Tainio, Tuulikki Tanska, Rachel Murray, Anssi Luodem?ki, Harri Humppi
Area: 19 700 m?
Year: 2020
Photographs: Tuomas Uusheimo, Marc Goodwin | Archmospheres
HVAC: Vahvacon
Structural Engeneering: AFRY Finland
Project Management: Jones Lang LaSalle Finland
Main Contractor: SRV Construction
Electrical Engineering: SitoWise Oy
Traffic: WSP Finland
Landscape Design: Roslings Manor Gardens
Geo Engineering: Sipti Infra Oy
新的五角形、五層高的Saukonlaituri停車(chē)設(shè)施包括六條流線(xiàn),可停放600輛私家車(chē),中央庭院被布滿(mǎn)巨石、苔蘚和蕨類(lèi)植物的景觀環(huán)繞。其中五個(gè)停車(chē)場(chǎng)有頂棚,第六個(gè)停車(chē)場(chǎng)位于屋頂。庭院具有雙重功能:它既是一個(gè)采光井,陽(yáng)光可通過(guò)庭院照射到較低的停車(chē)場(chǎng),又是雨水蓄水池和積雪堆積地。建筑的南側(cè)從入口廣場(chǎng)后退,將地面公共空間延伸為階梯式公園,一直延伸到屋頂。這種解決方案使周?chē)堑木用窨梢匝刂A梯走到正確的樓層取車(chē),而不是乘坐電梯。階梯區(qū)域也可以用于野餐和日光浴。
停車(chē)設(shè)施的承重結(jié)構(gòu)采用現(xiàn)澆混凝土,立面采用鍍鋅鋼框架中的大型中空陶瓷型材制成的預(yù)制構(gòu)件。未上釉的陶瓷條的自然色調(diào)與周?chē)鞣N類(lèi)型的磚砌建筑柔和地融合在一起。梯田的沙色方案、萊姆草和沙丘狀的特征來(lái)源于早已在填海造陸工程中消失的Saukko島嶼,現(xiàn)在已僅剩該地區(qū)使用的街道名稱(chēng)中可見(jiàn)其存在。梯田也使得近20 000平方米的停車(chē)設(shè)施,在視覺(jué)上看起來(lái)比它的規(guī)模小。
除了作為停車(chē)場(chǎng)并提供電動(dòng)汽車(chē)充電站外,該設(shè)施還設(shè)有一家私人維修公司和赫爾辛基市住房公司HEKA的維修車(chē)間。
The new five-cornered, five-story-tall Saukonlaituri parking facility consists of six circuits of parking for 600 private cars around a landscaped central courtyard with boulders, moss and ferns. Five of the circuits are covered and the sixth one is located on the roof. The courtyard has a double function: it both forms a light well bringing daylight down to the lower parking circuits and serves as a stormwater retainer and snow deposit. The southern side of the building falls back from the entrance square, stretching the ground-level public space as a terraced park all the way up to the roof. This solution allows the residents of the surrounding apartment blocks to access their cars by hiking up the terraces to the correct floor instead of taking the elevator there. The terraced area can also be used for picnics and sunbathing.
The load-bearing structure of the parking facility is cast-in-situ concrete, and the facades are prefabricated elements made of large hollow terracotta profiles in galvanized steel frames. The natural hues of the unglazed terracotta bars blend in softly with the neighboring buildings laid in various types of brick. The sandy color scheme, the Lyme grass and the dune-like character of the terraces refer to the island called Saukko - its outline long since disappeared in land reclamation, and its only presence today is in street names used in the area. The terraces also make the almost 20,000 m2 parking facility seem smaller than its size.
In addition to functioning as a parking garage and offering charging stations for electric vehicles, the facility houses the maintenance depots of one private maintenance company and the Helsinki City Housing Company HEKA.